Working procedure:

The excavator lifts the pile breaker over the pile and at first stage a complete horizontal fracture is made. The chisels penetrate in horizontal direction up to the re-bars for about 25 seconds to make the fracture. At second stage the chisels penetrate further (usually 25-40 mm) and due to the shape of the chisels and the reaction forces by the rebars, the concrete will break in pieces and can easily be lifted off the pile

Picxxel hydraulic pile breakers for circular piles offer following advantages

  • Up to ten times faster than conventional methods and up to 80 piles per day
  • Very compact dimensions
  • Low cut-off level
  • Easy to operate
  • No noise, no vibrations
  • No cracks below cut level
  • The reinforcement remains fully undamaged and intact
  • Leaves a perfect horizontal concrete fracture
  • Excellent service and spare parts availability